Black Button Distillery
A local distiller's new production facility required explosion proof wiring and extensive control systems.
Renovation on an existing warehouse originally constructed to build World War II tanks that also contained ceilings up to 50′. Once demolition was complete the team provided power, lighting, lighting controls, a 17 kW Generator for life safety systems, fire alarm, and security security.
The production area included control wiring and terminations to control cabinets for the automated distilling system along with explosion proof lighting, power, and fire alarm for hazardous locations through out the project.
Overall area: 30,100 square feet
Tasting Room area: 5,100 square feet
Production & Storage area: 25,000 square feet